hidden hit counter


HOME

 

FORUM ARCHIVE

 

CAD PLANS

 

TECH FEATURES

 

ADMIN 1

 

ADMIN 2



Top The TRMA Discussion Forum topic #54822
View in linear mode

Subject: "Surface heater question" Previous topic | Next topic
Ralph CurrellSun Mar-26-17 11:15 AM
Member since Mar 31st 2007
1791 posts
Click to send email to this author Click to send private message to this author Click to view this author's profile Click to add this author to your buddy list
#54822, "Surface heater question"


          

Hi all,

Looking at the placement of the surface heater on the reciprocating engine room's forward bulkhead (TTSM volume 1, figure 15-3), there's something I can't understand.

The heater drawings from the Board of Trade files give dimensions for the space to be allowed for withdrawing tubes for overhaul, but on the Olympic plans this clearly interferes with the lower deck and casing. They can't be withdrawn inboard either, because of the steam separator.



Would they have dismantled that small area of the lower deck? I assume overhauls would have been infrequent, perhaps once or twice a year.

Regards,
Ralph

Attachment #1, (gif file)

  

Alert | IP Printer-friendly copy | Reply | Reply with quote | Top

Replies to this topic

Bill WestSun Mar-26-17 01:24 PM
Member since Feb 02nd 2010
490 posts
Click to send email to this author Click to send private message to this author Click to view this author's profile Click to add this author to your buddy list
#54823, "RE: Surface heater question"
In response to Reply # 0


          

Hi Ralph
Tube renewals on US stream locomotives are every 5 years of regular service. Heater tubes might last longer as there is no corrosive smoke. Cleaning and leak repairs would of course be more often.

The space for removing the tubes is figurative, it shows the length of the tubes and their projected end area. In reality they are removed one tube at a time and that allows a degree of turning as they come out. The heat & cook heater drawings show that the tubes are in horizontal sub-sets. Working from the inboard end, if all are being renewed they would come out from the top down in each sub-set leaving the space above the set as room for tipping the inner ends up as the tube tilts down to comes out. If just one or two tubes need to be replaced it might be more difficult or require a few extra removals. An additional help is that the bottom of the separator, below the inlet pipe, likely comes off.

H&W probably didn't correct Weirs about an intent to renew the tubes from the inboard door instead of the outboard one. I didn't even see an end specified on the H&C heater.

I take it Karol has seen the H&C heater overview drawing posted here a few years ago but I don't know if he and Steve have seen the whole set of boiler, heater, filter and evaporator general drawings dispersed throughout the British National Archives/Board of Trade file, MT15-212. So I will mention that a large set of files can be downloaded from for US$8 at http://www.paperlessarchives.com/titanic_disaster_british_natio.html . Their Titles button lists some other combinations of Titanic documents too.

Bill

  

Alert | IP Printer-friendly copy | Reply | Reply with quote | Top

    
Ralph CurrellSun Mar-26-17 03:17 PM
Member since Mar 31st 2007
1791 posts
Click to send email to this author Click to send private message to this author Click to view this author's profile Click to add this author to your buddy list
#54825, "RE: Surface heater question"
In response to Reply # 1
Sun Mar-26-17 03:26 PMby Ralph Currell

          

Thanks Bill,

Your explanation helped a great deal. Withdrawing the tubes inboard seems to give a bit more working space if they can get around the presence of the separator. I'm sure it was a chore either way.

Regards,
Ralph

  

Alert | IP Printer-friendly copy | Reply | Reply with quote | Top

Top The TRMA Discussion Forum topic #54822 Previous topic | Next topic


Titanic artwork at top of page is owned and copyright of Stuart Williamson and is used with permission.